Friday, October 28, 2016

Lecco, collapses overpass in Annone Brianza on the SS36 state road: a dead – reuters uk



Anas: “We have asked for closing the road, but the Province blocked by the bureaucracy” – as The Anas, the company that manages the road network and the Italian highway, in the hours preceding the collapse of the flyover had asked for the closure of the road SP49 in the stretch, including the bridge, but the Province, which has jurisdiction on that road, has asked for an ordinance by the formal part of the institution. In the meantime, the bridge has caved in.

“13,30 to our operations room in Milan have called us telling us that there was rubble on state highway 36 and I arrived in less than 10 minutes, and then I saw 250 metres away, a patrol of the polstrada and I stop and I warned my office”, she told Tindaro Sauta, the capocantoniere Anas.

once alerted to the danger, however, the workers of the Province, you can still read in the note issued by Anas, “have required an ordinance by the formal part of the Anas which involved the visual inspection and direct part of the agency’s bureau chief Anas, which is activated immediately, but just when he was on the spot, the overpass came down.”

Tir precipitate was exceptional transport – . Anas has also made it known as the tir thrown from the overpass was an exceptional transport of considerable weight and dimensions authorized by the Province of Lecco. It is not yet verified the actual weight of the vehicle. The flyover concludes the Anas – had been made between the Sixties and the Seventies, the Province of Como.

replication of the Province: “Anas could close Ss 36″ – “Not as an ordinance, if Anas was believed to close the road could close it”. So the head of the road in the Province of Lecco, Angelo Valsecchi, responds to allegations of Anas, noting also “communication from the Anas to the Province was not so “explicit”.

“our staff has arrived at 14.30, we were here, but the structural checks compete with the Anas, we were waiting for the results, we were activated, but Anas has not told us to close the road. If the bridge is not of my property, I have to say, what to do, we explained, Valsecchi museum – we were ready to operate and waiting for their decisions”.

SETTINGS — >

LikeTweet

No comments:

Post a Comment