Shut down of interchanges, replacement of guardrails, road resurfacing and new signage. Set up the first sites on the Pontina but traffic was normal throughout the morning. The works on the extra urban road between Rome and Latina, will end on August 2: in the daytime opening hours, will cover the safety of junctions and replacing the guardrail. In the night however, the road resurfacing. Averted the entry into force of 50 and 60 kilometers per hour speed limits over this length, the distance limitations that only those sections near the yards. The work will still be suspended from Thursday, June 2 to Sunday 5 to facilitate travel at the bridge. The poster has been exposed and, despite the limitations and constrictions, this morning, there were no particular problems on the roads this morning. The time slots of the yards, operating from Monday to Friday, will be flexible to minimize the impact on the movement. In the next few hours will begin Finally interventions for road resurfacing and signage in the features: junction Laurentina -Trigoria; junction Pomezia- Torvaianica and Pomezia-Castelli Romani; exit Ardeatina Casalazzara; Junction Street Valle- lata and Aprilia-Appia exit. In the direction of Rome, however, will be affected the release of Pratica di Mare.
- Topics:
- Pontine
- road works
- Astral
- Starring:
No comments:
Post a Comment